Construction Projects

Windows Project Specifications

All windows in the front of the library on the main floor are scheduled to be replaced.  

Four windows on the left side of the front of the library, and four windows on the right side of the library with the following measurements.   Each window measures 44 inches wide by 48 inches high.

The tall front windows are also to be replaced.  It will be allowed to replace these windows with the following measurements, a top section of 37 inches wide by 18 inches high, and the bottom will be 37 inches wide by 84 inches high.  There are two windows on each side of the library for these measurements, a total of four.  

The Computer room window must also be replaced with measurements of 34 inches wide by 62 inches high.

The bathroom window to be replaced will be 15 1/4 inches by 35 1/4 inches.

All windows must be double hung windows with flat sill inserts, traditional checkrail.  Exterior and interior color to be white.

Glass must be high performance Smart Sun Glass or Insulated E3 Glass with argon gas – must have UV protection to help with preservation of library art and collections. 

Hardware must be white, standard color, with sash locks and sash lifts on double hungs, folding handle and multi-point lock on casements.  

Screens must be fiberglass, full screen.

Grilles are to be between the glass for easy cleaning, all sash, colonial 3 wide, 3 high.

The library is NY State Sales tax exempt, this must be reflected in the bid supplied.

The New York State Prevailing Wage Schedule must be adhered to.   Also proof of insurance must be supplied, specifically liability insurance.

The commencement date of the work should begin in July of 2022, and be completed by July 31, 2022.

Next Windows and Electricity Project

Upcoming this spring the Memorial room in the library will be going under renovation.  With many thanks to the ARPA Grant through the Richfield Springs Village, we will be updating the electricity in the memorial room and adding in floor outlets to eliminate the many cords stretching around the room at times.  

Coming up around April, the windows in the Memorial room, as well as the front attic of the library, will be replaced as well, also with thanks to the ARPA Grant through the Village.

With the electricity update, we will have to close down the use of the memorial room for a short time, but we will keep you all updated on that.